Spectrum
Spectrum by band
Holdings are grouped by the band a filing or agreement actually names. Granted means a regulator's document confers the right. In review means the regulator has accepted an application and has not granted it. Requested means a filing, proposal, or announcement that is not a grant. Testing means a regulator has licensed a trial or experiment. Total megahertz is shown only when a source states one number.
Where the filings sit on the dial
Ranges drawn for Canada. Grants for other countries are not listed in this view.
- Granted
- In review
- Requested
- Testing
- Granted — no local operator specified
Local operators
| Band | Country | Service | Status | Local operator | Reference |
|---|---|---|---|---|---|
| L-band | Canada | MSS | Requested | No local operator namedThe 23 Jun 2025 Form 8-K says the L-band usage rights cover the United States and Canada, and that the settlement includes ISED applications. No ISED decision was found. | Source pending |
Band by country
GrantedIn reviewRequestedTesting
L-band
2026-09-30 · Canada · Requested · Agreement · Service MSS
Same unclosed agreement as the United States. Bell Canada and TELUS are not named as the L-band licensees in these filings.
Local operator(s). No local operator named
Filings. The 23 Jun 2025 Form 8-K says the L-band usage rights cover the United States and Canada, and that the settlement includes ISED applications. No ISED decision was found.
Source pending
Country pages are on Countries. The Ligado docket is on Ligado.
References
Last reviewed 2026-11-14. Sources are linked beside the claims they support.